A machine shop installs a new local exhaust hood on a grinding station after air sampling showed metal dust above the OSHA PEL. The installer's report says the system is complete. Under OSHA's Recommended Practices, what should the safety professional do next?

Explanation

OSHA's Recommended Practices tell employers to follow up to confirm controls are effective, including inspecting and testing engineering controls, so airflow checks and new exposure sampling come next. Withdrawing respirators is the tempting step, but until sampling shows exposure below the PEL there is no evidence the hood is enough. Closing the item on installation alone, or waiting for the annual review, skips the verification. Source: OSHA Recommended Practices for Safety and Health Programs, Hazard Prevention and Control, action item 6.
Practise more questions →

See all past questions →

Unofficial study aid: not affiliated with, endorsed by, or connected to the Board of Certified Safety Professionals (BCSP). ASP® and CSP® are registered trademarks of BCSP. All practice questions are original study items and are not actual exam questions.